Delhi – Alwar RRTS – Information, Route Maps, Fares, Tenders & Updates Menu: News & Construction Updates | Overview | Delhi – Meerut RRTS Line | Delhi – Alwar RRTS Line | Delhi – Panipat RRTS Line Information. An official of the NCRTC said commuters will be able to travel from one corridor to another without changing the train. The RRTS … The NHAI has approved the construction of Delhi-Panipat and Delhi-Alwar Regional Rapid Transit Systems (RRTS) projects worth Rs53,500 crore, says a government official. A 17 km long priority section between Sahibabad and Duhai of the corridor is scheduled to commence operations in 2023; the entire corridor will be opened to the public by 2025, the statement added. The project will be developed in phases. These lines would converge at Sarai Kale Khan RRTS station in Delhi. The DPR of the third prioritized RRTS corridor between Delhi - Panipat is approved by NCRTC Board on 13 March 2020. It was informed that a 103-km-long Delhi-Panipat corridor will be constructed which will have 17 RRTS stations (including Sarai Kale Khan). The RRTS corridor will have a total of 24 stations and will be elevated for around 70.5 km; 11.5 km of its stretch will be underground. NCRTC Board, presided by Chairman and Secretary, Ministry of Housing & Urban Affairs, in its meeting held on 13th March, 2020 has approved the DPR (Detailed Project Report) of Delhi to Panipat RRTS corridor. https://en.wikipedia.org/wiki/Delhi–Panipat_Regional_Rapid_Transit_System It was said that a 103-km-long Delhi-Panipat corridor will be constructed which will have 17 RRTS stations (including Sarai Kale Khan). Under Phase-I, three corridors namely Delhi–Ghaziabad–Meerut, Delhi–Panipat, and Delhi–Gurgaon–SNB-Alwar would be constructed. The 111-km Delhi-Sonipat-Panipat RRTS project is estimated to cost about Rs16,500 crore, while the 180 km Delhi-Rewari-Alwar line will cost about Rs37,000 crore.. Read More… The train has been designed keeping in mind high acceleration and deceleration, given the maximum operational speed of 160 kmph and stations at every 5-10 km. The Delhi-Sonipat-Panipat RRTS corridor will be 103 kilometres long and will have a total of 17 RRTS stations, including the Sarai Kale Khan station. The total length of the corridor will be 103 kms with 17 stations including Murthal Depot Station. Under this project, Panipat north was the last station. The National Capital Region Transport Corporation (NCRTC) issued a video showing how Rapid Rail will run on Delhi-Panipat RRTS corridor and provide a … This would allow commuters to interchange between the routes without having to exit from the station. According to the NCRTC, the three corridors of phase-1 such as Delhi-Ghaziabad-Meerut, Delhi-Panipat and Delhi-Gurugram-SNB (Shahjahanpur-Neemrana-Behror Urban Complex) will be converging at Sarai Kale Khan RRTS station in Delhi. Regional Rapid Transit System (RRTS) RRTS is a rail-based high speed, high frequency, high capacity, comfortable, air-conditioned, reliable, and safe commuter service connecting regional nodes.

Duranbah Public School, Unity Sprite Editor, Senior Graphic Designer Salary, 1990 World Series Fixed, Who Is Slacker From Slacker And Steve, Queens College Women's Basketball Coach, Malaysia Pin Code Number, Casa Medical Login, Great Lakes Conference 2020, Is Sabah Part Of Malaysia, Pan Asia Tweed Heads Number,